Getting Your Content Into XML;
A Management Perspective
by
Mark Gross and John Lynch
Abstract: XML Conversion requires planning and should not be taken lightly. This white paper presents a successful methodology used at Data Conversion Laboratory, and provides an overview of issues encountered in the conversion process, as well as providing sample project plans and timelines
If you have the luxury to author your materials directly into XML, you might even skip this article. However, if you're like most people, you've probably amassed huge volumes of materials, produced in a multitude of electronic formats. Worse still, you most likely have mountains of documents, research reports and catalogues sitting somewhere in paper gathering dust. Even for new materials, it may be expecting too much to get your authors to do things exactly the way you want. Who are you to tell that Nobel Prize winner that he can't use his 1985 Macintosh? Is it really appropriate for your domain experts to have to learn the various rules of XML? Clearly, there are challenges. The bottom line? If you're like most people, moving your material into XML makes sense, but it can be a daunting task.
XML
and Structure
Whether
you're building an eCommerce site with an on-line catalogue containing
1,000,000 products, publishing journals online or on CD-ROM, or
maintaining a huge legal citation database, you need a way to maintain
your data in a more structured, easily reconfigurable format; XML is the
ideal way to do that. One of the ways XML provides that ability is in the
way it applies structure to information. Furthermore, to get the full
benefits of XML requires that you add structure that did not
previously exist. In order to do that with legacy data, usually amassed
over a period of many years and written by multiple authors, you'll need
to standardize those materials into a common mold. Adding to the
challenge, you'll need to concurrently add structural information. Getting
this done in any kind of volume requires comprehensive planning.
While
there are specific technical issues to be determined prior to project
commencement, those are not dealt with here. Rather, we deal most
extensively with how to plan and manage a large scale conversion effort.
Utilizing a proven methodology, you can build a process that allows what
you accomplished in your small demo to be extended into timely, accurate
and consistent deliveries over the next tens of thousands or millions of
pages.
Why
should I bother with a plan?
Be
it catalogue assimilation for eCommerce, or the conversion of scientific
or technical documents, most large scale document conversions fall victim
to bad planning. This usually has unacceptable effects on schedule,
quality and costs. The methodology described here incorporates upfront
data analysis, a Proof of Concept phase, intelligent software development,
a structured approach to testing the conversion concept before you
commit to a full production process, and an explicit production planning
task.
The
approach described is a four phase plan, which, in DCL's experience,
ensures that potential problems are encountered and addressed early on in
the process. You will want to identify them earlier rather than
later; getting them fixed now means that you'll be able to automate your
project with much greater accuracy.
While
our approach espouses significant preplanning which might get in the way
of people's tendency to "just get started", it does reliably
deal with the major issues in any large scale conversion effort:
- Time
to Market - How long can your users wait for you to be
ready? Can you guarantee that you meet your deadline? What are the
implications if you don't?
- Quality
- Will it be right? Will people be getting what they thought they
would?
- Cost-
Will you be able to reliably predict cost? Are you sure?
- Scalability
- Will you be able to convert and integrate a million of them the
same way you did your demo?

Figure
I: In large-scale conversion projects, people usually underestimate
the task at hand.
You
need a blueprint.
While
you might build a tool shed without a blueprint, it is not likely that you
would construct a 20 story building without one. Large conversion efforts
are quite similar to large construction projects and many of the
techniques to ensure that the final product meets the end-user's needs are
common to both.
There
is a tendency, when the pressure's on, to just get right on with it. After
all, that demo you did impressed everyone upstairs. In truth, if it's a
small project that you can do yourself over the weekend, you probably
don't need a sophisticated plan. If it's a larger, more complex project,
however, you will need a structured approach. There will be unknowns in
technology, and there will be a need to communicate effectively among a
number of people.
It's
clearly too risky to forego the planning stages. You'll need to describe
in advance exactly what the end product will look like, before you
manufacture a million of them. That means you'll need to build a formal
system to share information.
There
are other important questions to ask yourself. What are the principal risk
factors? How do I precisely describe to dozens, or perhaps hundreds of
people, what to do in a variety of cases? And how do I make sure they all
listen?
Ok,
when don't you need a plan? How large is large?
While
there is a gray area in which you might be able to bypass some of the
steps, Data Conversion Laboratory's experience shows that you always need
at least some of the planning stages. It's just too risky to play
it by ear. This is a sizable investment you are about to make; consider
the formal approach described here as a very inexpensive insurance policy.
The
number of people that will be involved in the project can make a
difference to the importance of a plan. But that's not the only thing upon
which to base your decision. Whenever there's significant complexity, new
technologies being explored, or you're simply doing something you've never
done before, it's critical to plan and "Proof of Concept" the
process before you start those machines rolling.
A
project plan overview.
No
matter how well you think it's going to go, a conversion project has many
unknowns. Following this suggested methodology will help to bring many of
those unknowns to the fore.
Data
Conversion Laboratory's conversion project experience has taught us that a
typical project's lifecycle can be divided cleanly into four phases. See
Figure II.
Figure
II: The lifecycle of a conversion project can be divided into four
distinct phases.
A
key benefit of this phased approach is that there are a number of specific
checkpoints at which you can reconsider the project in terms of new
information and redirect it to best fit where you're going.
- Phase
1: Concept and Planning - The purpose of this phase is to get
everyone to agree to a common definition of what the project is.
You'll want to lay out the project objectives and expectations, define
the success criteria, lay out a preliminary approach, identify the
risk areas, estimate approximate cost ranges and define a preliminary
budget.
- Phase
2: Proof of Concept - The purpose of this vital step is to test
your approach on a limited scale, paying particular attention to the
areas identified as potential risk areas. The results of this phase
will help you arrive at a more detailed plan, while further fleshing
out functional requirements. Based on the results of the test,
preliminary software is prepared, and cost projections are fine-tuned.
- Phase
3: Analysis, Design, and Engineering - This is the critical
step where all the details get worked out and the project gets
prepared for volume production. Specifically, keying and conversion
specifications are finalized, cleanup and review guidelines are
defined, and final production costs are confirmed. More generally, the
entire conversion process is finalized and tested, and production
rampup begins.
- Phase
4: Production - This is the step we've all been waiting for -
data flowing smoothly at 500 or 50,000 pages a week. Provided that the
preceding 3 steps were done well, there's not a whole lot to say about
this phase. What you will need, however, are some tools in place to
closely monitor quality and productivity.
In
addition to the four phases, there are two other important aspects to this
methodology. These are the underlying disciplines shown as two stripes at
the bottom of figure II. As in any large project, management and quality
control are critical and apply to every phase. Ideally, a single person
will oversee both disciplines in order to guarantee continuity.
OK.
This sounds like a plan, but who does the work?
It
all depends on the staffing and the experience that you have available.
While
the nuts and bolts of doing the conversion require some specialized skills
and facilities, the actual planning and management process requires much
the same skills required to manage any large, complex project. If you have
people with experience available to dedicate to this effort, then you can
probably do it internally. If not, you may want to consider outsourcing.
The key issue is not to overlook the fact that this effort will need dedicated
project management talent.
Phase
1: Concept and Planning
Although
it is an important step, this can be a pretty short one if you've
carefully thought through exactly what you want to happen.It may just be a
day or two, though it's more likely to be several weeks. The major
elements of this phase are described below:
Project
Concept - Everybody needs to be on the same page. The first step is to
clearly define the project, and to get an agreement that people's various
expectations are the same. You simply cannot meet a goal that you don't
know about in advance. At this point, the project concept is discussed at
a high level, without getting bogged down in detail. The following are the
critical questions that need to be answered honestly.
- What
do you need to do, and how quickly do you need to do it?
- Do
you have a technical approach in mind?
- What
are the goals and what are the success criteria?
- What's
critical and what's nice to have?
- What's
the expected budget? And what are estimated costs?
- Where
are the tradeoffs in time, budget, and functionality?
The
end result of this analysis is a Project Concept document.
Materials
Evaluation - While a detailed inventory of materials does not usually
get done until the Proof of Concept phase, it is critical to get an early
understanding of the project's scope. Design and implementation decisions
on where best to focus resources will be based on this information. This
is illustrated by the chart in Figure III, and while the specific
questions will vary from project to project, typical questions are:
- How
big is the project? You need to quantify in terms you're used to
thinking in - pages,
books, journal issues, products, etc?
- How
much source variation is there? - Materials may have been produced in
a multitude of electronic formats, on different computer operating
systems, or by different typesetters. Some of it may even live as
paper, under dust, in huge warehouses.
- How
much format variation is there? How often has the layout format
changed over the years? Invariably, different authors choose to lay
out in different ways; while it would be nice to have a strictly
enforced template, if you're dealing with legacy data, you're bound to
find a lot of formatting inconsistency.
- What
are the special issues? Tables, formulas, cross-referencing and
graphics are all areas that need special attention in the planning
process.
All
of these critical issues will differ slightly from project to project;
it's a good idea to lay them out explicitly in a format like Figure III.
Figure
III: The materials evaluation sheet will be invaluable in helping you
understand the scope of the conversion task.
Rough-Cut
Pricing Estimate - Usually, there is not enough information available
this early in the process to allow accurately predicting the project's
overall production costs. There are simply too many variables that will
not be finalized until well into Phase II. However, it is possible (and
useful) to start assembling rough-cut costing parameters.
Figure
IV: It's important, early on, to get a feel for what the rough-cut
numbers will be.
It's
generally a good idea to use a chart like the one shown in Figure IV to
lay out what the major tasks in the production process are. Alongside
this, cost ranges are laid out for what those tasks have historically
taken. What this provides you with, are some very broad ranges. These are
useful, both for feasibility analysis ("I didn't know we were talking
about a $2,000,000 project!"), and for sensitivity analysis ("If
we didn't have to do that step we could save $2.00 per page"). If
budgeting has not yet been done for your project, these ranges will also
prove to be useful guides for setting budgets.
Project
Feasibility Analysis - While the information collected so far is
fairly sketchy, this is an early opportunity to assess, based on those
broad parameters, whether the project is still feasible. You need to
answer some of the following questions. If this is a $1-$2 million
project, does it still make good business sense to proceed? If it's way
over budget can we redefine the project's scope? Is there another way to
do this? Can we do without certain elements so as to bring down the cost?
If so, does the project make sense at a reduced level? And most
importantly, does it make sense to go on with Phase 2?
Phase
II: Proof of Concept
So
Phase I has told you that this may actually be worth pursuing. You've got
the rough cut estimate, and even your CFO admits that it sounds like a
pretty sound business model. Most importantly, everyone is agreed on what
the broad strokes of the project are. The next step is the Proof of
Concept.
The
purpose of the Proof of Concept phase is to test your planned approach on
a limited scale. This will be your opportunity to test out the areas that
were identified as being particularly risky, and to test on a small scale,
the hypothesis developed in Phase I. The results of this phase will
provide a more detailed plan including the following: fleshed out
functional requirements, preliminary software development, a converted
sample set, and more finely-tuned cost projections.
Returning
to the building analogy again, this is the step where the preliminary
design is laid out, and a model built so that everyone can get an idea of
what the building will look like. Additionally, a test boring is done to
ensure that the soil will be able to support the building.
Figure
V: Establishing a project timeline will help ensure that you
accomplish what you need on schedule.
Figure
V shows a typical project timeline for this phase. For a significantly
larger project, this phase might take 6-10 weeks. The key stages and
deliverables are described below:
Project
Initiation - You always need a project kickoff meeting. One of the
main purposes of this meeting is to make sure that everyone on the
expanded team has the same understanding of the project concept. The team
will probably include a project manager, a domain expert, a data analyst,
a programmer and a senior editor.
The
project initiation is also where the detailed task plan is created and
reviewed. The task plan will help ensure that everyone understands their
roles and responsibilities as a member of the team.
Defining
the Sample Set - Important questions need to be answered in order to
define the Proof of Concept. Be patient here; you probably won't be ready
after the kickoff meeting.
Ask
yourself the following questions: What's intended to be proven? How big
should the sample be? Which project elements are known technology and
therefore don't need to be part of this exercise? Which elements are
particularly risky or unknown and need special focus?
Beware
the common mistakes. While there may be a tendency to try to do everything
at once, or to do the easy parts first, remember that the real purpose is
to focus on a small data set, and on the risky and unknown areas. Fail to
identify where your project's critical challenges are now, and the
hypothesis of your whole project might be off.
With
this in mind, it may be better to focus on 10 pages of difficult
bibliographic references or complex tables, rather than 100's of pages of
straightforward or repetitive text. And if there are 20 major variations
of material, don't try to analyze them all; instead, pick the 2 or 3 that
are most representative of the issues.
Inventory
Materials - This task invariably evokes groans, but someone has got to
do it. You need to have a good idea of how big the pile is, and a clear
understanding of the variation contained within the pile. The exact
methodology you use to collect this information will vary depending on the
project.
While
it would be ideal to get a detailed list of everything that needs to be
done, that's not usually the case. What you are trying to do at this stage
is get an understanding of how much of each type of material there might
be. The reason for this, is, that each type of material will probably
require its own programming and conversion process. And while building
conversion software to help automate much of the conversion makes sense,
you don't want to invest lots of programming time automating for a
particularly difficult type of materials that you only have 10 pages of.
Developing
Decision-Making Guidelines - This is usually the heart of the Proof of
Concept phase. The extent to which you can you develop rules and
guidelines for transforming your source materials into "properly
tagged data" will be the most important determinant of final cost of
this project. In other words, it needs to be done with care.
The
domain expert and the data analyst will work closely together here, to try
to generalize the rules and condense them into as small a set as possible.
What you are trying to do at this stage, is build a functional set of
rules. Don't make the mistake of turning this into a programming exercise;
that will just bog you down at this stage. Equally importantly, don't give
up too early. While the usual tendency is to think there are no rules -
"it's just common sense and you either know it or you don't" -
that's probably not the case.
The
Conversion Specification Document – It is useful at this stage to
formalize the guidelines derived to this point into a single document. The
Conversion Specification Document will become the primary repository of
project information; it will be continually consulted and reviewed by the
end user, the domain expert, the analyst, and the programmer. This
document expands the previously established guidelines into a set of rules
that can be programmed for. It also identifies areas that are ambiguous or
difficult to define; these areas will then need to be reviewed by the
domain expert. The Conversion Specification document typically circulates
among the various parties involved, and becomes the central discussion
document until issues are resolved. It is also the document that defines
the programming efforts.
POC
Software and Sample Set Conversion - OK, so you've written the
conversion specification document; hopefully it addresses all the major
issues of the conversion. Now it's time to see if you can really use those
guidelines and specifications to convert anything.
As
in the Project Initiation task, you need to be cautious here. While most
successful conversion projects combine automation with manual effort,
programming should be done sparingly at this point. There simply isn't
time during the Proof of Concept to program for everything you'd like to.
In addition, there will be a tendency to program for the easy things
first. The best approach is to select a few complex areas which people
doubt can be converted in an automated manner. For these areas, invest
time testing out programmatic approaches to their unique problems; this
learning process will be invaluable and will help tremendously when you
move on to Phase III. For the rest of the set, however, it probably makes
sense for people to follow the conversion specification manually, rather
than investing heavily in writing and testing programs.
The
end result of this phase should give you a good feel for what can or
should be automated, and what will need to be done manually. It will also
yield some valuable timings on what the labor elements of this project are
likely to be.
Future
Phase Planning and Pricing - If you've done your job right thus far,
you'll now be able to more closely estimate the project's costs, and lay
out a realistic timeframe in which it can be done. As more materials are
tested and converted in the next phase, these estimates will be further
refined. Keep in mind that programming costs will rise in the next phase
as you start to expand your efforts toward automation. However, if the
materials you initially selected for the sample are truly representative,
and you've taken into account people's learning curves as they started
working with your sample data, what you have now is pretty close.
This
phase is also the check point at which to determine whether the project
still makes sense. This checkpoint let's you make a go/no go decision
based on the outcome of the POC. Ask yourself the following questions: Are
the costs still in line with our budget? Were we able to prove the concept
that we came up with in the first phase? Are we getting the quality we
expected? Was our original time estimate (or the promises I made to our
backers) doable?
In
deciding whether this project is feasible or not, figure out what the
Proof of Concept has yielded.
What
did this exercise buy you?
- Time
to Market - you'll have a realistic estimate of how long this
project will take as well as your options for speeding it up.
- Quality
- you'll be able to demonstrate expected results while there's
still time to make modifications.
- Cost
- you'll have an understanding of the project costs and what the
tradeoffs are.
- Scalability
- you'll have the tools in place to create a process that scales
as big as you want.
Phase
III: Analysis, Design and Engineering.
By
now, we should have a clear understanding of what we want to achieve from
this conversion. The Proof of Concept will have yielded valuable clues as
to where and how to refine our conversion guidelines. Mistakes will be
identified and concepts will be proven. You'll understand the true
complexity of the project and the steps you need to overcome them. The
Proof of Concept, more than anything else, should land the entire
conversion team on the same page. And, it will become the foundation upon
which our entire process will be built.
The
following are the primary results of the Proof of Concept:
·
Improved conversion guidelines.
·
Refined conversion specification.
· Refined
conversion software.
·
More finely tuned cost projections.
Phase
III is primarily a matter of refining the various deliverables done on the
conversion sample, for the fuller set of materials. Here we build upon
what was done during the Proof of Concept and expand the analysis, design,
and engineering components to handle the full set of materials.
Additionally, we go back and program for all the things we did not have
time for (or did not need to prove) during the Proof of Concept. Planning
for gradual ramp-up and full volume production processing will also be
done at this point.
A
typical project timeline for this phase is shown in Figure VI:
Figure
VI: It's important to lay out a timeline for the analysis, design and
engineering phase of the project; for the typical larger project, this
phase will likely take 6-10 weeks.
Phase
III is made up of the following key tasks:
Production
Process Planning - Integrating the various elements of the conversion
process is too often an afterthought. That can be an expensive mistake.
The most mundane things, such as agreeing upon filename conventions and
basic data trafficking procedures, are too often not properly planned in
advance. Typically, a large conversion effort consists of between 30-50
independent steps requiring multiple skills, and often multiple vendors.
There are also time dependencies that need to be integrated in order to
ensure a smooth production flow.
In
planning the production process, there are also a number of important
logistical considerations:
- How
many pages a week can each step in the process handle?
- What's
the weak link in the chain?
- Can
you keep up with reviewing and inspecting converted materials
as they're delivered?
- Technical
questions will arise; will there be a dedicated point of contact on
both sides?
- How
will materials be transported back and forth?
Another
important question to ask is - how much time will it take? With an ongoing
production facility that handles thousands of pages a day, you still need
to allow 4-6 weeks for the integration to take place. You'll therefore
need to start early in Phase III. And if you're going to be building a
process from scratch, you should allow at least 6 months.
Production
Quality Planning - While many of the standard quality control
processes apply to conversion projects, there is a significant difference.
Chips Ahoy may make the best cookies, but they'll tell you that they only
use the choicest chocolate chips and the finest flour. Unlike a cookie
factory, you can't really control the quality of ingredients coming into
your machine. No matter how well you select your samples and trial
materials, you are unlikely to find every significant variation;
therefore, it's probably expecting too much to hope to account for all the
possibilities in advance. The documents will typically have been written
by many individuals, at several different locations, in many different
editing packages, over a long period of time, and on a variety of systems.
So, like the people who made them, the documents will have personalities.
And, like people, their behavior may not always be exemplary.
Ensuring
quality control in this environment means building feedback loops at each
step of the process. These checkpoints are designed to report when things
are not meeting expectations, and provide guidelines, rather than rules,
to the people inspecting the results. Information needs to flow back and
forth easily in order to allow refinement of this process. You'll also
need to collect statistics in order to tell how much sampling will be
needed as the process improves.
Production
Ramp Up - Just as we advised in Phase 1, caution is critical at this
stage. We usually find that the best approach is to plan for a few weeks
of low volume production through the initial production process. This will
help to identify any weaknesses in our process.
The
entire production team needs to be aware that the purpose of the first
weeks of production is to provide feedback in order to help engineer a
smoother process. This is not yet the time to put dozens of people to
work, but rather a time to assign a select few individuals who are capable
of figuring out where improvements can be made.
Phase
IV: Production
You're
almost there, but you do need to continually monitor results and make sure
that quality and productivity stay where you expect them to be.
Full-Volume
Production - Even after the production ramp-up stage, it is not
necessarily prudent to plan for full production volumes immediately. We've
found it best to gradually increase volumes, thereby allowing ample time
for people to be trained and to come fully up to speed.
Production
Process Control - You need a method to track production through the
various phases. For smaller projects, Excel spreadsheets may be
sufficient. But for larger projects, you probably need something more
sophisticated. At a minimum you need to know where in the process each
batch of materials are, how long a batch is taking to go through, and how
much material is awaiting each phase.
Materials
Trafficking - It is very rare that you have everything that needs
conversion ready in a pile at the beginning of a project. More likely,
materials will be readied gradually as the project progresses. In order to
avoid slowdowns later in the process, someone needs to be in charge of
trafficking the materials, making sure that materials are ready and
complete, and forwarding them appropriately.
Process
Improvement Feedback - It certainly won't be perfect when you first go
into production. You will need a method to formally collect information on
exceptions and on what's not working properly. This method will need to be
quite flexible as different parts of the process will report exceptions at
different times.
Packaging
and Delivery - This doesn't seem like a big deal, but you need to get
the finished materials to the right person. The right materials! Otherwise
frustration can set in. This is also a convenient point at which to do
some final quality checking, and to document any specific procedures the
person you're delivering to needs to follow.
Exception
Handling Mechanisms - You'll also have to allow for exception
reporting. Exception reports are delivered to the end user along with the
completed data. Because of the wide variance and inconsistencies of the
materials being converted, there will inevitably be materials that need
special handling by the recipient. And it would seem wise to have a
mechanism more sophisticated than yellow stickies to deal with this.
Where
do I go from here?
There
is a lot to absorb in this article. If you only take six things from what
you've read, take the following:
- Don't
just do it. Figure out exactly what you want to accomplish, before
you start planning, then plan it before you do it.
- Project
Management and Quality Assurance are key issues. To ensure that the
project proceeds properly and on time, you'll need a dedicated team.
Don't think of this as a part-time job; your critical team members
need to be dedicated to the project.
- Communications
are key. The domain expert, the technical expert and management all
need to be on the same page.
- Select
your sample set carefully. It's better to pick 200 pages that are
truly representative of the key issues, than 5000 pages on a hit or
miss basis.
- Don't
underestimate the value of a well crafted production process; work
through the details of the production process before you ramp
up to volume processing.
- You'll
need to be sure that it's working; build feedback loops into every
step to monitor, control and continually improve the production
process.
Figure
VII: Maybe it's a good idea for everyone involved to read this
article.
Just
as your company relies on good management and planning, so too will your
project. By following the detailed plan outlined in this white paper, it's
possible to plan and engineer a smooth project, guided by the disciplines
of a proven methodology.
|
|
|
|
|
|
DITA/TECHCOMM 2008, Raleigh, NC, November 3-6 2008. More…
ATA e-Business Europe, Budapest, Hungary, October 21-23 2008. More...
9th Annual Vasont Users' Group Meeting, Hershey, PA, October 6-8, 2008. More…
XyUser Phoenix, AZ, September 22-24, 2008. More…
Best Practices Santa Fe, NM, September 15-17, 2008. More…
Doc Train Life Sciences Indianapolis, IN, June 23-25, 2008. More…
X-Pubs London, England, June 22-24, 2008. More…
Mark Logic User San Francisco, CA, June 10-12, 2008. More…
PTC User Long Beach, CA, June 2-4, 2008. More…
Ultramain User Conference 2008, Albuquerque, NM, May 11-15, 2008. More…
Documentation and Training West 2008 Vancouver, BC, May 6-9, 2008. More…
CMS/DITA Santa Clara, CA, April 7-9, 2008. More…
DIA Med Comm Orlando, FL, March 10-11, 2008. More…
DIA EDM Philadelphia, PA, February 5-7, 2008. More…
Gilbane Boston Conference Boston, MA, November 29, 2007. More…
The LavaCon Conference on Advanced Technical Communication and Project Management New Orleans, LA, October 27-30, 2007. More…
2007 ATA e-Business Forum Miami, Florida, Oct 17-19, 2007. More…
DITA 2007™-East, Raleigh, North Carolina, October 4-6, 2007. More…
2007 XyUser Group Fall Conference, Boston, MA, Sept 23-26, 2007. More…
Mark Logic 2007 User Conference, San Francisco, CA, May 15-17, 2007. More…
Content Management Strategies/DITA North America
Conference 2007, Boston, MA, March 26-28, 2007. More…
DIA 18th Annual Workshop,
San Diego, CA. March 4-7, 2007. More…
DIA 2007 EDM & CDM Conference, Philadelphia, PA, Feb 6 - 8, 2007. More…
DITA 2007 – West, San Jose, CA, February 5-7, 2007. More…
Framemaker 2006 Chautauqua, Austin, TX, Nov 8-10, 2006. More…
PTC/User World Event 2006, Grapevine, TX, June 4-6. More…
19th Annual DIA Conference Philadelphia, PA, February 7-9. More…
XyUser's Conference, San Diego, California, September 11-14. DCL's Don Bridges delivered a presentation on "Content Reuse" More…
Structured Product Labeling, Washington, DC, August 23-24. More…
Tri-XML 2005, Raleigh, NC , July 28. DCL's Don Bridges delivered a presentation on "Content Reuse" More…
Pharmaceutical Labeling and Product Identification, Whippany, NJ, June 16-17. DCL's Don Bridges delivered a presentation on "Structured Product Labeling (SPL) and the Implications of Implementing an XML Solution." More…
|
|